精品人妻少妇一区二区三区,老汉色av影院,国产国语在线播放视频,美女内射毛片在线看3d

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機的生產(chǎn)與制造

24小時全國服務熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://www.shishanglu.com

當前位置:首 頁 ? News ? Industry trends

Six steps to choose the right machine for vertical injection molding machine

文章出處:臺佑電子 | 作者:臺佑電子 | 發(fā)表時間:2020-07-06

1. Obtain: Whether the "mold opening stroke" and "mold support stroke" are enough to take out the finished product depends on the mold and the finished product. The opening stroke of the mold should be at least twice the height of the finished product in the direction of mold opening and closing, and should include the gate length. The stroke of the mold support should be sufficient to launch the finished product;


2. Shoot well: "Screw compression ratio" and "shooting pressure" are determined by plastic. Some engineering plastics require a higher injection pressure and a suitable screw compression ratio design to obtain better molding results. Therefore, in order to make the finished product shoot better, the injection pressure and compression ratio should also be considered when selecting the screw. In general, a screw with a smaller diameter can provide a higher injection pressure.


3. Choose the appropriate model: the model and series are determined by the product and plastic. Because there are many types of injection machines, it is necessary to correctly determine at the beginning which injection machine or series should be used to produce this product, such as general thermoplastic or bakelite raw materials or polyester raw materials, they are single color, double color, multi Color, sandwich color or mixed color. In addition, some products require high stability (closed loop), high precision, high rate of fire, high ignition pressure or rapid production (multi-loop). The appropriate series must be selected for production.


4. Coordination: According to the size of the mold, determine whether the "large column inner distance", "mold thickness", "small mold size" and "template size" of the machine are suitable to confirm whether the mold can fit. The width and height of the mold should be less than or at least one side should be less than the distance between the large columns. The width and height of the mold are preferably within the size range of the template; the thickness of the mold should be between the thickness of the injection molding machine. The width and height of the mold should meet the small mold size recommended by the injection molding machine, and it is too small; so far, the specifications of the mold clamping device have been initially determined, and the tonnage of the model has been roughly determined. Then, the following steps must be performed to confirm which injection unit has a screw diameter that meets the requirements.


5. Shoot fast: and confirm the "shooting speed". Some finished products require high injection rate and high speed to be stable, such as ultra-thin finished products. In this case, it may be necessary to confirm whether the machine's injection rate and injection rate are sufficient, and whether it is necessary to match the pressure accumulator, closed loop control and other devices. In general, under the same conditions, a screw capable of providing a higher ignition pressure usually has a lower ignition rate. On the contrary, a screw capable of providing a lower ignition pressure usually has a higher ignition rate. Therefore, when selecting the screw diameter, it is necessary to consider and select the injection amount, injection pressure, and injection rate (injection speed).


6. Full injection: According to the weight of the finished product and the number of die holes, determine the required "injection amount" and select the appropriate "screw diameter". When calculating the weight of the finished product, the number of die holes (a few holes per die) should be considered; for stability, the injection volume should be greater than 1.35 times the weight of the finished product, that is, the finished product weight should be within 75% of the injection volume;

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

女人另类牲交zozozo| 天天碰免费上传视频| 亚洲一久久久久久久久| aa级女人大片免费视频| 中文在线а√天堂| 女同性av片在线观看免费网站| 曰本女人与公拘交酡| 天天躁日日躁狠狠躁| 久久精品无码av| 国内精品伊人久久久久网站| 久久国产精品一国产精品| 国产午夜三级一区二区三| 色欲色香天天天综合网www| 免费av一区二区三区| 国产动作大片中文字幕| 狠狠躁夜夜躁人人躁婷婷视频| 亚洲精品动漫免费二区| 成人免费777777被爆出| 日韩a∨精品日韩在线观看| 熟妇人妻一区二区三区四区| 亚洲午夜福利在线观看| 国产乱子伦视频在线观看| 欧美激情a∨在线视频播放| 影音先锋中文字幕人妻| 日韩日韩日韩日韩日韩日韩 | 免费人成视频在线播放| 欧美黑人又粗又大久久久| 中文字幕av一区| 红桃av一区二区三区在线无码av| 亚洲中文字幕无码一久久区| 夜夜躁狠狠躁2021| 亚洲av永久无码精品一百度影院| 人妻无码一区二区三区免费| 国产精品ⅴ无码大片在线看| 亚洲av无码av制服丝袜在线| 欧美老熟妇乱大交xxxxx| 在线观看的av网站| 国产精品永久免费视频| 免费无码又爽又刺激高潮视频 | 天堂资源中文网| 九色综合九色综合色鬼|